• DocumentCode
    2384734
  • Title

    Modifying Existing 138-kV Transmission Towers to 230-kV Capacity

  • Author

    Wood, Brian C. ; Moore, Timothy L.

  • Author_Institution
    Sargent & Lundy, LLC, Chicago, IL
  • fYear
    2006
  • fDate
    21-24 May 2006
  • Firstpage
    1139
  • Lastpage
    1143
  • Abstract
    In order to satisfy growing electrical demand in the San Diego, California area, San Diego Gas and Electric Company (SDG&E) is modifying existing transmission towers to maximize right of way utilization. Recent projects include modifying existing 138-kV towers to 230-kV capacity. Design considerations including construction methods, and electrical and structural requirements are discussed
  • Keywords
    poles and towers; 138 to 230 kV; SDG&E; San Diego Gas and Electric Company; San Diego, California; construction methods; electrical demand; electrical requirements; right of way utilization; structural requirements; transmission towers; Bridge circuits; Conductors; Costs; Distributed parameter circuits; Insulator testing; Lattices; Plastic insulation; Poles and towers; Transmission lines; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Transmission and Distribution Conference and Exhibition, 2005/2006 IEEE PES
  • Conference_Location
    Dallas, TX
  • Print_ISBN
    0-7803-9194-2
  • Type

    conf

  • DOI
    10.1109/TDC.2006.1668663
  • Filename
    1668663