• DocumentCode
    2396941
  • Title

    Formal design and analysis of FMS controller

  • Author

    Gang, Xu ; Wu, ZhiMing

  • Volume
    2
  • fYear
    2003
  • fDate
    12-15 Oct. 2003
  • Firstpage
    1299
  • Abstract
    A modeling method for controller in FMS is presented. This method is based upon the timed automata, and model checker tool UPPAAL is used to model, simulate and verify the FMS model. In the previous work about FMS modeling, the behavior of FMS is more emphasized than the performance, or vice versa. Because the time is included into the modeling method, the scheduling and controlling problems in FMS can be integrated into this model. The performance of the system can be guaranteed while the system behavior is controlled. Upon this model, the optimal scheduling and optimal controlling can also be checked and verified.
  • Keywords
    automata theory; flexible manufacturing systems; modelling; optimal control; scheduling; flexible manufacturing systems controller; model checker tool; modeling method; optimal controlling; optimal scheduling; timed automata; Automata; Automatic control; Control systems; Design methodology; Flexible manufacturing systems; Job shop scheduling; Optimal scheduling; Production; Real time systems; System recovery;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Transportation Systems, 2003. Proceedings. 2003 IEEE
  • Print_ISBN
    0-7803-8125-4
  • Type

    conf

  • DOI
    10.1109/ITSC.2003.1252693
  • Filename
    1252693