Research on Improved PERT Model in Analysis of Schedule Risk of Project
Author
Zhang Yunning ; Sun Xixi
Author_Institution
Bus. Sch., Hohai Univ., Nanjing, China
fYear
2010
fDate
7-9 May 2010
Firstpage
2768
Lastpage
2771
Abstract
PERT (program evaluation and review technique) is one of the most popular means in Project Time Management, however, it exists some shortcomings. Based on the assumptions of PERT, this paper illustrates the disadvantages of the normal three times estimation method and gives countermeasures to solve these problems. Firstly, it adopts the Monroe method to improve the normal ß distribution. Secondly, it improves the accuracy of the normal method of three times estimation by adopting the restrictive probability to estimate the three times and the minimal deviation model. Thirdly, it considers the effects of the secondarily crucial line. Consequently, the paper applies a new model to analyze schedule risk of project and divides it into five different grades.
Keywords
PERT; risk management; scheduling; time management; Monroe method; improved PERT model; minimal deviation model; normal ß distribution; program evaluation and review technique; project schedule risk; project time management; secondarily crucial line; three times estimation method; Accuracy; Analytical models; Data models; Estimation; Gaussian distribution; Schedules; Monroe method; PERT; scedule risk; the restrictive probability of three times estimation;
fLanguage
English
Publisher
ieee
Conference_Titel
E-Business and E-Government (ICEE), 2010 International Conference on
Conference_Location
Guangzhou
Print_ISBN
978-0-7695-3997-3
Type
conf
DOI
10.1109/ICEE.2010.699
Filename
5590752
Link To Document