    Research on Improved PERT Model in Analysis of Schedule Risk of Project

  • Author

    Zhang Yunning ; Sun Xixi

  • Author_Institution
    Bus. Sch., Hohai Univ., Nanjing, China
  • fYear
    2010
  • fDate
    7-9 May 2010
  • Firstpage
    2768
  • Lastpage
    2771
  • Abstract
    PERT (program evaluation and review technique) is one of the most popular means in Project Time Management, however, it exists some shortcomings. Based on the assumptions of PERT, this paper illustrates the disadvantages of the normal three times estimation method and gives countermeasures to solve these problems. Firstly, it adopts the Monroe method to improve the normal ß distribution. Secondly, it improves the accuracy of the normal method of three times estimation by adopting the restrictive probability to estimate the three times and the minimal deviation model. Thirdly, it considers the effects of the secondarily crucial line. Consequently, the paper applies a new model to analyze schedule risk of project and divides it into five different grades.
  • Keywords
    PERT; risk management; scheduling; time management; Monroe method; improved PERT model; minimal deviation model; normal ß distribution; program evaluation and review technique; project schedule risk; project time management; secondarily crucial line; three times estimation method; Accuracy; Analytical models; Data models; Estimation; Gaussian distribution; Schedules; Monroe method; PERT; scedule risk; the restrictive probability of three times estimation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    E-Business and E-Government (ICEE), 2010 International Conference on
  • Conference_Location
    Guangzhou
  • Print_ISBN
    978-0-7695-3997-3
  • Type

    conf

  • DOI
    10.1109/ICEE.2010.699
  • Filename
    5590752