• DocumentCode
    2399922
  • Title

    The next generation UTC data transmission system for London-TCAM

  • Author

    Ibrahim, D. ; Clarke, P.

  • Author_Institution
    Traffic Control Syst. Unit, London, UK
  • fYear
    1998
  • fDate
    21-23 April 1998
  • Firstpage
    135
  • Lastpage
    138
  • Abstract
    The traffic lights in the Greater London area, which are under Urban Traffic Control (UTC), are connected via leased telephone lines to UTC in-station computers running fixed-time plans or the SCOOT adaptive control algorithm. As part of the London UTC modernisation scheme, a new data transmission system known as TCAM is currently being developed. TCAM (Traffic Control and Monitoring) is a data transmission system specified jointly by TCSU and Microsense Systems Ltd. TCAM is a TCP/IP based open system specification, allowing equipment from different manufacturers to be interfaced to the system. This paper outlines the current state of the TCAM project.
  • Keywords
    computerised monitoring; data communication; open systems; project engineering; road traffic; signalling; telephone lines; traffic control; Greater London; TCAM project; TCP/IP; UTC data transmission system; Urban Traffic Control; computerised monitoring; open system; road traffic; telephone lines; traffic control; traffic light control;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Road Transport Information and Control, 1998. 9th International Conference on (Conf. Publ. No. 454)
  • ISSN
    0537-9989
  • Print_ISBN
    0-85296-701-2
  • Type

    conf

  • DOI
    10.1049/cp:19980170
  • Filename
    683647