• DocumentCode
    24101
  • Title

    Trade-Off Between UoS Charge and Investment Cost for New Distribution Network Users

  • Author

    Chenghong Gu ; Yue Yuan

  • Author_Institution
    Dept. of Electron. & Electr. Eng., Univ. of Bath, Bath, UK
  • Volume
    30
  • Issue
    1
  • fYear
    2015
  • fDate
    Jan. 2015
  • Firstpage
    542
  • Lastpage
    543
  • Abstract
    This letter investigates the situation that high use-of-system charge (UoSC) might appear for new network users and studies the potential of network investment to avoid the high charge. It proposes a method to strike the trade-off between UoSC and investment cost, in the form of connection charge (CC). It determines the utilization level where UoSC and CC reach equilibrium. Beyond this level, it is more economical to conduct network investment for new users to avoid high UoSC. The trade-off between the two type charges provides effective signals for new network users to manage their connecting size and location. The concept is illustrated on a two-busbar system.
  • Keywords
    costing; investment; power distribution economics; UoS charge; UoSC; connection charge; distribution network users; investment cost; network investment; use-of-system charge; Color; Distributed power generation; Indexes; Investment; Joining processes; Power systems; Pricing; Connection charge; equilibrium; investment; long-run incremental cost; tradeoff; use of system charge;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/TPWRS.2014.2321993
  • Filename
    6822655