DocumentCode
24101
Title
Trade-Off Between UoS Charge and Investment Cost for New Distribution Network Users
Author
Chenghong Gu ; Yue Yuan
Author_Institution
Dept. of Electron. & Electr. Eng., Univ. of Bath, Bath, UK
Volume
30
Issue
1
fYear
2015
fDate
Jan. 2015
Firstpage
542
Lastpage
543
Abstract
This letter investigates the situation that high use-of-system charge (UoSC) might appear for new network users and studies the potential of network investment to avoid the high charge. It proposes a method to strike the trade-off between UoSC and investment cost, in the form of connection charge (CC). It determines the utilization level where UoSC and CC reach equilibrium. Beyond this level, it is more economical to conduct network investment for new users to avoid high UoSC. The trade-off between the two type charges provides effective signals for new network users to manage their connecting size and location. The concept is illustrated on a two-busbar system.
Keywords
costing; investment; power distribution economics; UoS charge; UoSC; connection charge; distribution network users; investment cost; network investment; use-of-system charge; Color; Distributed power generation; Indexes; Investment; Joining processes; Power systems; Pricing; Connection charge; equilibrium; investment; long-run incremental cost; tradeoff; use of system charge;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/TPWRS.2014.2321993
Filename
6822655
Link To Document