• DocumentCode
    2414687
  • Title

    Designing prefabricated substation buildings according to GOST standards

  • Author

    Hazel, Terence ; Norris, Alain ; Barbizet, Michel ; Safin, Rafic

  • Author_Institution
    Schneider Electr., Grenoble, France
  • fYear
    2002
  • fDate
    2002
  • Firstpage
    251
  • Lastpage
    259
  • Abstract
    Prefabricated electrical substation buildings were chosen for supplying power to the pipeline linking the oil producing regions of the Caspian Sea to a new port facility on the Black Sea. All electrical equipment was required to be in compliance with the standards and regulations of the Russian Federation and Kazakhstan. This added to the complexity of the design, construction, commissioning and operation of the equipment and systems. The paper describes some of the difficulties that occurred, and the solutions implemented when applying local regulations and in obtaining GOST-R and GOST-K certification from the Russian Federation and Kazakhstan.
  • Keywords
    oil technology; power system planning; standards; substations; GOST standards; GOST-K certification; GOST-R certification; Kazakhstan; Russian Federation; commissioning; construction; local regulations; oil pipeline power supply; prefabricated electrical substation buildings design; standards compliance; Buildings; Certification; Code standards; IEC standards; Petroleum; Pipelines; Prefabricated construction; Production; Region 8; Substations;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Petroleum and Chemical Industry Conference, 2002. Industry Applications Society 49th Annual
  • ISSN
    0090-3507
  • Print_ISBN
    0-7803-7384-7
  • Type

    conf

  • DOI
    10.1109/PCICON.2002.1045009
  • Filename
    1045009