• DocumentCode
    2416923
  • Title

    Radiated emission measurement procedures at an open-area test site

  • Author

    Schieve, Richard L.

  • Author_Institution
    AT&T Bell Lab., Naperville, IL, USA
  • fYear
    1989
  • fDate
    23-25 May 1989
  • Firstpage
    151
  • Lastpage
    156
  • Abstract
    Some typical measurement procedures used to perform radiated emission measurements at an open-area test site are discussed. Topics covered include examples of test equipment used, some aspects of emission maximization, equipment under test (EUT) activity during tests, and the minimum set of measurements required to assure compliance. Also discussed are some methods used to distinguish emissions from the EUT from background noise and situations where automation can be used to reduce human error and provide for more efficient data gathering
  • Keywords
    automatic test equipment; electromagnetic interference; electromagnetic waves; electronic equipment testing; test facilities; EMI; automation; background noise; data gathering; emission maximization; equipment under test; open-area test site; radiated emission measurements; test equipment; Adaptive arrays; Antenna measurements; FCC; Home computing; Integrated circuit interconnections; Length measurement; Open area test sites; Performance evaluation; Position measurement; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electromagnetic Compatibility, 1989., IEEE 1989 National Symposium on
  • Conference_Location
    Denver, CO
  • Type

    conf

  • DOI
    10.1109/NSEMC.1989.37170
  • Filename
    37170