• DocumentCode
    2419988
  • Title

    London Underground platform to train CCTV studies

  • Author

    Aldred, B.

  • Author_Institution
    London Underground Ltd.
  • fYear
    1997
  • fDate
    35775
  • Firstpage
    42461
  • Lastpage
    412
  • Abstract
    When one person (train) operation was introduced it was necessary to install equipment within the confines of tunnels, platforms and trackside and indeed within the rolling stock itself, to provide a method of safe operation at the platform to train interface. This has and still does present major challenges associated with the wide range and diversity of platforms and structures on the underground. The paper gives a historical and in depth view of how these problems have been overcome and the issues associated with providing CCTV to ensure a safe transition at the platform to train interface. In particular it focuses on the platform to train CCTV study and demonstrate how continuous improvements have been applied to each successive system
  • Keywords
    closed circuit television; London Underground; closed circuit television; platform to train interface; rolling stock; safe operation; trackside; train CCTV; tunnels;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Advances in Railway Communication Systems. Digest of Papers (Ref. No. 1997/401), IEE
  • Conference_Location
    London
  • Type

    conf

  • DOI
    10.1049/ic:19971392
  • Filename
    668020