DocumentCode
2429332
Title
Signaled step size for downlink power control of dedicated channels in UTRA TDD
Author
Kurjenniemi, J. ; Lehtinen, Otto ; Ristaniemi, Tapani
Author_Institution
Dept. of Math. Inf. Technol., Jyvaskyla Univ., Finland
fYear
2002
fDate
2002
Firstpage
675
Lastpage
679
Abstract
This paper discusses downlink inner loop power control in UTRA TDD. The current UTRA TDD downlink power control is similar to one in UTRA FDD mode, but due to the time division feature of TDD it can not operate as fast as in FDD and it is affected by rapid changes in environment. In this paper an improvement for the downlink inner loop power control algorithm is presented in which the power control step size is based on the difference between UE measured SIR and target SIR. This difference is then signaled from UE to UTRAN. Since the effectiveness of this algorithm depends on available signaling bandwidth that is used, dynamic system simulations are carried out to find out how many bits are needed for the signaling and how this algorithm is affected by signaling and measurement errors.
Keywords
3G mobile communication; measurement errors; multiuser channels; power control; radio links; radiofrequency interference; 3GPP standardization forum; UTRA FDD; UTRA TDD; dedicated channels; downlink inner loop power control; dynamic system simulations; measured SIR; measurement errors; power control algorithm; power control step size; signaled step size; signaling bandwidth; signaling errors; target SIR; Current measurement; Downlink; Feedback; Information technology; Power control; Power generation; Power measurement; Scheduling algorithm; Signal generators; Time measurement;
fLanguage
English
Publisher
ieee
Conference_Titel
Mobile and Wireless Communications Network, 2002. 4th International Workshop on
Print_ISBN
0-7803-7605-6
Type
conf
DOI
10.1109/MWCN.2002.1045851
Filename
1045851
Link To Document