• DocumentCode
    2468969
  • Title

    Multi-criteria optimization of maintenance activities

  • Author

    Jeromin, Ingo ; Birkner, Peter ; Balzer, Gerd ; Asgarieh, Leyla

  • Author_Institution
    Mainova AG, Germany
  • fYear
    213
  • fDate
    10-13 June 213
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    An important task of the asset management process is the evaluation of the long-range investment and resource planning of the assets of the complete power system. The main problem of the asset manager is to reduce the maintenance costs under the condition to keep the availability of the system on a high level. This multi-criteria task is exemplary solved on the basis of three different assets groups (power transformers, circuit-breakers and disconnectors) and in total 75 pieces of equipment of a 110 kV system.
  • Keywords
    asset management; circuit breakers; maintenance engineering; optimisation; power system management; power system planning; power transformers; asset management process; asset resource planning; circuit breakers; disconnectors; long-range investment; maintenance activities; maintenance cost reduction; multicriteria optimization; multicriteria task; power transformers; voltage 110 kV;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution (CIRED 2013), 22nd International Conference and Exhibition on
  • Conference_Location
    Stockholm
  • Electronic_ISBN
    978-1-84919-732-8
  • Type

    conf

  • DOI
    10.1049/cp.2013.0682
  • Filename
    6683285