DocumentCode
2470361
Title
Performance evaluation of protection functions for IEC 61850-9-2 process bus using real-time hardware-in-the-loop simulation approach
Author
Almas, M.S. ; VANFRETTI, LUIGI
Author_Institution
KTH R. Inst. of Technol., Stockholm, Sweden
fYear
213
fDate
10-13 June 213
Firstpage
1
Lastpage
4
Abstract
With the evolution of Process Bus (IEC 61850-9-2), there is a need to assess the performance of protection schemes using process bus against those where traditional copper wires are implemented. Differential protection is the fundamental and most commonly used protection for transformers, motors and generators. In this paper a power system is modelled in SimPowerSystems and is executed in real-time using Opal-RT´s eMEGAsim real-time simulator. Hardware-in-the loop validation of a process bus implementation for differential protection for a two winding transformer is done by using the differential protection feature in ABB´s RED-670 relay. The event reports generated by the ABB relay during Hardware-in-the-Loop testing are compared for three different scenarios i.e. complete process bus, hybrid process bus and complete traditional topology.
Keywords
IEC standards; electric generators; electric motors; power engineering computing; relay protection; transformer protection; transformer windings; wires (electric); ABB RED-670 relay; IEC 61850-9-2 process bus; Opal-RT eMEGAsim real-time simulator; SimPowerSystems; copper wire; differential protection; generator protection; motor protection; protection function performance evaluation; real-time hardware-in-the-loop simulation approach; transformer protection; transformer winding;
fLanguage
English
Publisher
iet
Conference_Titel
Electricity Distribution (CIRED 2013), 22nd International Conference and Exhibition on
Conference_Location
Stockholm
Electronic_ISBN
978-1-84919-732-8
Type
conf
DOI
10.1049/cp.2013.0752
Filename
6683355