• DocumentCode
    2484832
  • Title

    Dynamic Programming Approach for Large Scale Unit Commitment Problem

  • Author

    Singhal, Prateek Kumar ; Sharma, R. Naresh

  • Author_Institution
    Electr. Eng. Dept., Nat. Inst. of Technol., Hamirpur, India
  • fYear
    2011
  • fDate
    3-5 June 2011
  • Firstpage
    714
  • Lastpage
    717
  • Abstract
    In this paper, the large scale Unit Commitment (UC) problem has been solved using Dynamic Programming (DP) and the test results for conventional DP, Sequential DP and Truncation DP are compared with other stochastic techniques. The commitment is such that the total cost is minimal. The total cost includes both the production cost and the costs associated with start-up and shutdown of units. DP is an optimization technique which gives the optimal solution.
  • Keywords
    dynamic programming; large-scale systems; power generation dispatch; power generation economics; power generation scheduling; stochastic processes; conventional DP; dynamic programming approach; large scale unit commitment problem; optimization technique; production cost; sequential DP; start-up cost; stochastic technique; total cost; truncation DP; Central Processing Unit; Dynamic programming; Generators; Optimization; Production; Schedules; Spinning; binary particle swarm optimization; dynamic programming; evolutionary programming; genetic algorithm; lagrange relaxation; simulated annealing; unit commitment;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Communication Systems and Network Technologies (CSNT), 2011 International Conference on
  • Conference_Location
    Katra, Jammu
  • Print_ISBN
    978-1-4577-0543-4
  • Electronic_ISBN
    978-0-7695-4437-3
  • Type

    conf

  • DOI
    10.1109/CSNT.2011.152
  • Filename
    5966543