DocumentCode
2509090
Title
Progress on 140 GHz, 1 MW, CW series gyrotrons for W7-X
Author
Jelonnek, J. ; Braune, H. ; Dammertz, G. ; Erckmann, V. ; Flamm, J. ; Gantenbein, G. ; Hollmann, F. ; Jonitz, L. ; Kasparek, W. ; Kern, S. ; Laqua, H.P. ; Lechte, C. ; Légrand, F. ; Leonhardt, W. ; Lietaer, G. ; Michel, G. ; Noke, F. ; Purps, F. ; Samarts
Author_Institution
Assoc. EURATOM-KIT, Karlsruhe Inst. of Technol. (KIT), Karlsruhe, Germany
fYear
2012
fDate
23-28 Sept. 2012
Firstpage
1
Lastpage
2
Abstract
The construction of the 140 GHz, 1 MW CW gyrotrons for the 10 MW ECRH system of the stellarator W7-X at IPP Greifswald is ongoing. While acceptance testing of the gyrotrons is progressing, reliable output parameters and stable production have been achieved. This report summarizes the actual status and some topical results. Focus is put on the final construction and latest parameters measured at factory-acceptance tests and site-acceptance tests. Parallel to the design optimization a new spectral measurement method has been developed, which allows time-dependent broadband spectral measurements with μs resolution for ms range pulses. Results of measurements done with W7-X gyrotrons are shown.
Keywords
gyrotrons; millimetre wave tubes; stellarators; testing; CW series gyrotrons; ECRH system; IPP Greifswald; W7-X gyrotrons; W7-X stellarator; design optimization; factory-acceptance tests; frequency 140 GHz; power 1 MW; power 10 MW; site-acceptance tests; spectral measurement method; time-dependent broadband spectral measurements; Electron tubes; Frequency modulation; Gyrotrons; Oscillators; Power generation; Production; Reliability;
fLanguage
English
Publisher
ieee
Conference_Titel
Infrared, Millimeter, and Terahertz Waves (IRMMW-THz), 2012 37th International Conference on
Conference_Location
Wollongong, NSW
ISSN
2162-2027
Print_ISBN
978-1-4673-1598-2
Electronic_ISBN
2162-2027
Type
conf
DOI
10.1109/IRMMW-THz.2012.6380200
Filename
6380200
Link To Document