Transmission network expansion planning consdering pumped-storage unit
Author
Rathore, Chandrakant ; Roy, Ranjit
Author_Institution
Electr. Eng. Dept., S.V. Nat. Inst. of Technol., Surat, India
fYear
2015
fDate
19-21 Feb. 2015
Firstpage
1
Lastpage
5
Abstract
This paper presents, the impact of the pumped-storage (PS) unit on the static transmission network expansion planning problem (STNEP). The aim of this work is to minimize the total cost which is a summation of the transmission line cost, the fuel cost and the load curtailment cost. The load curtailment cost is included in the objective function to avoid the additional artificial generation. The proposed problem is tested on the IEEE 24-bus system and the gbest-guided artificial bee colony (GABC) optimization algorithm is applied to this problem. Also, in order to analyze the load variations on the proposed STNEP problem three different load levels are considered.
Keywords
optimisation; power transmission planning; pumped-storage power stations; fuel cost; gbest-guided artificial bee colony optimization algorithm; load curtailment cost; pumped-storage unit; static transmission network expansion planning problem; transmission line cost; Fuels; Heuristic algorithms; Mathematical model; Optimization; Planning; Reservoirs; DC power flow; artificial bee colony optimization; investment cost; pumped-storage; resizing; transmission expansion planning;
fLanguage
English
Publisher
ieee
Conference_Titel
Signal Processing, Informatics, Communication and Energy Systems (SPICES), 2015 IEEE International Conference on
Conference_Location
Kozhikode
Type
conf
DOI
10.1109/SPICES.2015.7091432
Filename
7091432
Link To Document