• DocumentCode
    2510967
  • Title

    A single-machine scheduling problem with two agents and decreasing linear deteriorating jobs

  • Author

    Liu, Peng ; Yi, Na ; Zhou, Xiaoye

  • Author_Institution
    Sch. of Manage., Shenyang Univ. of Technol., Shenyang, China
  • fYear
    2011
  • fDate
    23-25 May 2011
  • Firstpage
    279
  • Lastpage
    282
  • Abstract
    This paper deals with the two-agent scheduling problem with decreasing linear deteriorating jobs on a single machine, where the goal is to minimize the total completion time of the first agent with the restriction that the maximum cost of the second agent cannot exceed a given upper bound. Two agents compete to perform their respective jobs on a common single machine, and each agent has his own criterion to optimize. We introduce a decreasing linear deterioration model into the two-agent single-machine scheduling where the processing times of jobs are defined as a decreasing linear function of their starting times. We propose the optimal properties and present the optimal polynomial time algorithm to solve the scheduling problem.
  • Keywords
    polynomials; single machine scheduling; decreasing linear function; linear deteriorating jobs; linear deterioration model; optimal polynomial time algorithm; two-agent single-machine scheduling problem; Complexity theory; Job shop scheduling; Optimal scheduling; Processor scheduling; Schedules; Single machine scheduling; Decreasing linear deterioration; Scheduling; Single machine; Two-agent;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control and Decision Conference (CCDC), 2011 Chinese
  • Conference_Location
    Mianyang
  • Print_ISBN
    978-1-4244-8737-0
  • Type

    conf

  • DOI
    10.1109/CCDC.2011.5968187
  • Filename
    5968187