• DocumentCode
    2516094
  • Title

    Elevator group scheduling for peak flows based on Adjustable Robust Optimization model

  • Author

    Zhang, Jinglong ; Zong, Qun ; Wang, Fang ; Li, Junfang

  • Author_Institution
    Coll. of Electr. Eng. & Autom., Tianjin Univ., Tianjin, China
  • fYear
    2011
  • fDate
    23-25 May 2011
  • Firstpage
    1593
  • Lastpage
    1598
  • Abstract
    Group elevator scheduling has received more attention with the increase demand of high-rise buildings. The key factor which affects the transportation performance´s further improvement is the uncertainty of traffic flow. Moreover, peak flows are rather common in buildings, while their uncertainties aren´t considered by most algorithms, that could result in larger scheduling price. It´s feasible to solve the problem of uncertain peak flows´ dispatching with the method of Adjustable Robust Optimization (ARO). In this paper, ARO theory is put into practice, an ARO model for peak flows of Elevator Group Control System (EGCS) is built, the idea of modeling is shown, and an ARO dispatching approach is proposed. Simulation results demonstrate the validity of the approach. Finally, future trends of ARO group scheduling are summarized.
  • Keywords
    dispatching; lifts; optimisation; scheduling; transportation; ARO dispatching; ARO group scheduling; ARO model; ARO theory; adjustable robust optimization model; elevator group control system; elevator group scheduling price; high-rise building; traffic flow; transportation performance; uncertain peak flow dispatching; Dispatching; Elevators; Floors; Optimization; Robustness; Uncertainty; Adjustable Robust Optimization (ARO); Elevator Group Scheduling; Peak Flows;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control and Decision Conference (CCDC), 2011 Chinese
  • Conference_Location
    Mianyang
  • Print_ISBN
    978-1-4244-8737-0
  • Type

    conf

  • DOI
    10.1109/CCDC.2011.5968448
  • Filename
    5968448