DocumentCode
2516181
Title
Research on SMMEs´ planning and scheduling
Author
Meirong, Xu ; Rongxia, Qu
Author_Institution
Key Lab. of Integrated Autom. of Process Ind., Northeastern Univ., Shenyang, China
fYear
2011
fDate
23-25 May 2011
Firstpage
1624
Lastpage
1628
Abstract
On the background of ERP system, aiming at the multi-variety and small-batch production in SMME, the planning and scheduling problems were analyzed. The tasks, resources and constraints were introduced firstly, and then a closed-loop frame was provided to eliminate the conflicts, at the same time, the heuristic algorithm was introduced to get the appointed list. The results showed that this method could improve the veracity and equilibrium of planning and scheduling problems of work shop.
Keywords
enterprise resource planning; machinery production industries; production planning; scheduling; small-to-medium enterprises; ERP system; SMME; closed-loop frame; heuristic algorithm; multivariety production; planning problem; scheduling problem; small-and-medium machinery enterprises; small-batch production; Finishing; Job shop scheduling; Materials requirements planning; Planning; Raw materials; SMME; heuristic algorithm; loop-closed scheduling; planning and scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Control and Decision Conference (CCDC), 2011 Chinese
Conference_Location
Mianyang
Print_ISBN
978-1-4244-8737-0
Type
conf
DOI
10.1109/CCDC.2011.5968453
Filename
5968453
Link To Document