DocumentCode
2516318
Title
Rolling horizon scheduling of multi-factory supply chains
Author
Cho, Eunkyoung G. ; Thoney, Kristin A. ; Hodgson, Thom J. ; King, Russell E.
Author_Institution
Coll. of Textiles, North Carolina State Univ., Raleigh, NC, USA
Volume
2
fYear
2003
fDate
7-10 Dec. 2003
Firstpage
1409
Abstract
The virtual factory is a job shop scheduling tool that was developed at NC State. It has been found to provide near-optimal solutions to industrial-sized problems in seconds. Recently, the virtual factory was expanded to include interfactory transportation operations, which enabled the detailed scheduling of entire multifactory manufacturing supply chains. Separately, a rolling horizon procedure was developed to test the virtual factory for single factory problems. This procedure allowed us to more accurately predict how the virtual factory would perform in industry. Consequently, the rolling horizon procedure was extended to multifactory settings to gauge industrial performance and eliminate transient effects found in previous multifactory experimentation. Experimental results, under a variety of different scenarios, indicate that the virtual factory also performs well in multifactory, rolling horizon settings.
Keywords
batch processing (industrial); digital simulation; job shop scheduling; rolling; supply chain management; virtual manufacturing; batch processing; interfactory transportation; job shop scheduling tool; multifactory supply chain manufacturing; rolling horizon procedure; virtual factory; Educational institutions; Job shop scheduling; Manufacturing industries; Production facilities; Routing; Supply chains; Testing; Textiles; Transportation; Virtual manufacturing;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference, 2003. Proceedings of the 2003 Winter
Print_ISBN
0-7803-8131-9
Type
conf
DOI
10.1109/WSC.2003.1261583
Filename
1261583
Link To Document