Abstract
In this paper with the background of evolution of regional electricity grids in India aiming at the formation of National Grid, Indian experience of running the electricity grid with the procedure established to safeguard the system against possible blackouts has been detailed. This has been followed by the restoration measures adopted earlier in the event of such occurrences and as envisaged for future, particularly in the context of four out of five regional grids operating in synchronism and the remaining one connected asynchronously with the rest.
Keywords
power grids; power system restoration; Indian power system; blackout mechanism; regional electricity grid; restoration mechanism; Frequency synchronization; HVDC transmission; Job shop scheduling; Joining processes; Power grids; Power system interconnection; Power system restoration; Relays; Safety; Thyristors; Black out; black start; fog; islands; load crash; restoration; synchronization;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century, 2008 IEEE
Conference_Location
Pittsburgh, PA
ISSN
1932-5517
Print_ISBN
978-1-4244-1905-0
Electronic_ISBN
1932-5517
Type
conf
DOI
10.1109/PES.2008.4596684
Filename
4596684
Link To Document