• DocumentCode
    2547183
  • Title

    A capacity planning model for TFT-LCD production networks

  • Author

    Lin, James T. ; Chen, Tzu-Li ; Chu, Hsiao-Ching ; Yang, Chung-Han

  • Author_Institution
    Dept. of Ind. Eng. & Eng. Manage., Nat. Tsing-Hua Univ., Hsinchu, Taiwan
  • fYear
    2009
  • fDate
    21-23 Oct. 2009
  • Firstpage
    1663
  • Lastpage
    1668
  • Abstract
    The paper presents a capacity planning model for TFT-LCD production network. The capacity planning decision of TFT-LCD manufacturing is to simultaneously seek an optimal capacity allocation plan and capacity expansion policy. Capacity allocation decides on profitable product mixes and allocated production quantities of each product group at each production site. Capacity expansion concerned with determining the timing, types and sizes of capacity investments, especially in the procurement of new bottleneck machines and acquisition of new auxiliary tools. This study proposes a mixed integer linear programming (MILP) to formulate the capacity planning problem which considers many practical characteristics of TFT-LCD manufacturing such as multi-generation & multi-site production network, two capacity types, economic cutting ratio, and high capacity expansion costs. Finally, a case study modified from a Taiwan TFT-LCD manufacturer is illustrated.
  • Keywords
    capacity planning (manufacturing); industrial economics; integer programming; investment; linear programming; liquid crystal displays; procurement; thin film transistors; TFT-LCD manufacturing; TFT-LCD production network; allocated production quantity; auxiliary tool; capacity expansion policy; capacity investment; capacity planning; economic cutting ratio; high capacity expansion cost; mixed integer linear programming; multigeneration production network; multisite production network; optimal capacity allocation plan; procurement; production site; profitable product mixes; Capacity planning; Cathode ray tubes; Costs; Fabrication; Investments; Manufacturing industries; Procurement; Production; Thin film transistors; Timing; Capacity Planning; Production Network; TFT-LCD;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management, 2009. IE&EM '09. 16th International Conference on
  • Conference_Location
    Beijing
  • Print_ISBN
    978-1-4244-3671-2
  • Electronic_ISBN
    978-1-4244-3672-9
  • Type

    conf

  • DOI
    10.1109/ICIEEM.2009.5344327
  • Filename
    5344327