DocumentCode
2550069
Title
Study on work improvement in a packaging machine manufacturing company
Author
Sun, X.F. ; Cheng, G. ; Li, W.
Author_Institution
Sch. of Mech. & Electron. Eng., Beijing Union Univ., Beijing, China
fYear
2009
fDate
21-23 Oct. 2009
Firstpage
1155
Lastpage
1159
Abstract
This paper studies the improvement of production efficiency and balance rate of the manual assembly line in a packaging machine manufacturing company. Modular arrangement of predetermined time standards (MODAPTS) method is used to obtain time values for elements and for entire operations of the manual assembly line. Also the ECRS four principles (eliminate, combine, rearrange and simple) are used to minimize the idle time at every station or the percentage of line balance loss. In order to verify the results that were obtained from the generated line-balancing pre- and post-, Witness simulation software is used to estimate the output. Simulation results showed that productivity increases about 41.72% higher than the current situation.
Keywords
digital simulation; machinery production industries; packaging machines; production engineering computing; productivity; Witness simulation software; balance rate; combine principle; eliminate principle; manual assembly line; modular arrangement of predetermined time standards method; packaging machine manufacturing company; production efficiency; rearrange principle; simple principle; work improvement; Assembly; Automotive engineering; Computer numerical control; Heat treatment; Packaging machines; Production; Productivity; Sun; Virtual manufacturing; Workstations; Assembly line balancing; MODAPTS; Simulation; Work measurement;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management, 2009. IE&EM '09. 16th International Conference on
Conference_Location
Beijing
Print_ISBN
978-1-4244-3671-2
Electronic_ISBN
978-1-4244-3672-9
Type
conf
DOI
10.1109/ICIEEM.2009.5344458
Filename
5344458
Link To Document