• DocumentCode
    2551500
  • Title

    Requirement Change Management Process Models: Activities, Artifacts and Roles

  • Author

    Ramzan, Saffena ; Ikram, Naveed

  • Author_Institution
    Interational Univ., Islamabad
  • fYear
    2006
  • fDate
    23-24 Dec. 2006
  • Firstpage
    219
  • Lastpage
    223
  • Abstract
    Modern software-intensive systems are developed in a world where only constant thing is change. This results in continuously changing requirements. Failure to manage these changing requirements properly may result in failure of system. To manage these requirements, many requirements change management (RCM) process model has been proposed in the literature. Process models facilitate human understating and communication, support process improvement and process management. Coverage of process elements like activities, artifacts and roles has an affect on process model and its usage. This paper reports the current requirements change management process models in the literature on the basis of activities, artifacts and roles. Our survey highlights that there is lack of consensus on RCM process and it has not been described in sufficient detail for use of requirements engineers in the real world.
  • Keywords
    management of change; software development management; software maintenance; requirements change management; software requirements engineering; software-intensive systems; Costs; Engineering management; Humans; Performance evaluation; Project management; Software development management; Software systems; Systems engineering and theory; Testing; Writing; Change Management; Process Model; Requirements Engineering; Requirements Management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Multitopic Conference, 2006. INMIC '06. IEEE
  • Conference_Location
    Islamabad
  • Print_ISBN
    1-4244-0795-8
  • Electronic_ISBN
    1-4244-0795-8
  • Type

    conf

  • DOI
    10.1109/INMIC.2006.358167
  • Filename
    4196410