DocumentCode
2552410
Title
Minimal forbidden set based heuristics for resource-constrained project scheduling
Author
Liu, Shixin
Author_Institution
Sch. of Inf. Sci. & Eng., Northeastern Univ., Shenyang
fYear
2008
fDate
2-4 July 2008
Firstpage
181
Lastpage
184
Abstract
This paper presents a minimal forbidden set based heuristics for solving resource-constrained project scheduling problems (RCPSP) to minimize project makespan and maximize schedule robustness. The heuristics solves the RCPSP by adding disjunctive arcs into project networks to destroy minimal forbidden set, viz. resolve resource conflicts, so that the resulting networks are precedence and resource feasible. Four priority rules are applied in the heuristics, and they are evaluated by computational experiment citing two sets of instances from problem library PSPLIB. Computational results show that the presented heuristics can generate project schedules of short project makespan and high schedule robustness.
Keywords
project management; scheduling; set theory; minimal forbidden set based heuristics; resource-constrained project scheduling problem; Automation; Information science; Job shop scheduling; Laboratories; Libraries; Processor scheduling; Project management; Robustness; Heuristics; Minimal Forbidden Set; Planning and Scheduling; Priority Rule; Project Management;
fLanguage
English
Publisher
ieee
Conference_Titel
Control and Decision Conference, 2008. CCDC 2008. Chinese
Conference_Location
Yantai, Shandong
Print_ISBN
978-1-4244-1733-9
Electronic_ISBN
978-1-4244-1734-6
Type
conf
DOI
10.1109/CCDC.2008.4597294
Filename
4597294
Link To Document