• DocumentCode
    2552817
  • Title

    Research on separate production workshop dynamic productive plan and real-time monitoring system

  • Author

    Xu, Rui-yuan ; Liu, Wei-Liang ; Shi, Hong-fa

  • Author_Institution
    HeBei Univ. of Sci. & Technol., Shijiazhuang, China
  • fYear
    2009
  • fDate
    21-23 Oct. 2009
  • Firstpage
    373
  • Lastpage
    375
  • Abstract
    This system will enhance the production efficiency and the management level of separate production workshop. It makes up the flaw in the ERP implementation process and proposes the more concrete data acquisition and the control method in view of the production. This method implementation will be able to cause the planned time fixed quantity to be more accurate gradually and cause the plan and the control to be more convenient and accurate. So it provides the basis for the work norm formulation and the achievements inspection.
  • Keywords
    data acquisition; enterprise resource planning; production planning; ERP implementation process; data acquisition; planned time fixed quantity; production efficiency; production management; production workshop dynamic productive plan; real-time monitoring system; Adjustability coefficients; Dynamic productive plan; Production scheduling; Supervisory system;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management, 2009. IE&EM '09. 16th International Conference on
  • Conference_Location
    Beijing
  • Print_ISBN
    978-1-4244-3671-2
  • Electronic_ISBN
    978-1-4244-3672-9
  • Type

    conf

  • DOI
    10.1109/ICIEEM.2009.5344570
  • Filename
    5344570