DocumentCode
2556973
Title
Effect of collector efficiency on levelized electricity cost of 200 MW solar chimney power plant in India
Author
Akhtar, Zainab ; Rao, K.V.S.
Author_Institution
Centre for Energy & Environ., Rajasthan Tech. Univ., Kota, India
fYear
2015
fDate
4-6 Feb. 2015
Firstpage
1
Lastpage
6
Abstract
This paper presents an economic analysis of solar chimney power plant (SCPP) of 200 MW capacity in India by taking fifteen different sets of dimensions of chimney height and collector diameter, five sets each corresponding to collector efficiency of 33%, 50% and 65%. Quantity of different materials required and capital cost for construction of 200 MW solar chimney power plant is estimated. Based on capital cost, operation cost and maintenance cost, levelized electricity cost (LEC) for SCPP is calculated first for five sets corresponding to collector efficiency of 33% and calculations have been demonstrated. Calculations are repeated for collector efficiency values of 50% and 65%. Further, capital cost and LEC for different values of collector efficiency were compared.
Keywords
solar chimneys; solar power stations; India; LEC; SCPP; capital cost; collector efficiency; levelized electricity cost; maintenance cost; operation cost; power 200 MW; solar chimney power plant; Biological system modeling; Economic indicators; Mathematical model; Power conversion; Power generation; Sustainable development; Collector efficiency; Economic analysis; Levelized electricity cost; Solar chimney power plant;
fLanguage
English
Publisher
ieee
Conference_Titel
Technologies for Sustainable Development (ICTSD), 2015 International Conference on
Conference_Location
Mumbai
Type
conf
DOI
10.1109/ICTSD.2015.7095908
Filename
7095908