DocumentCode
2558633
Title
Just-in-time AMHS delivery for 300 mm FAB
Author
Chang, Jonathan ; Cheng, Yung
Author_Institution
Inst. of Manuf. Eng., Nat. Cheng Kung Univ., Tainan, Taiwan
fYear
2004
fDate
9-10 Sept. 2004
Firstpage
25
Lastpage
28
Abstract
When investing high cost to setup a 300 mm FAB transportation automation (3% of overall 300 mm FAB capital according to ITRS 2003), we always review the performance and KPl of this huge investment to make sure that the investment could gain sufficient ROI (return of investment) from 300 mm FAB automation operation productivity. When we are approaching ITRS´s AMHS matrix - average FAB wide transportation should be 8 minutes; maximum FAB wide FOUP transportation should be 15 minutes. We found that just-in-time integrated system design could easily gain more 300 mm full-automation productivity than expensive AMHS investment.
Keywords
goods distribution; investment; just-in-time; materials handling; semiconductor device manufacture; semiconductor technology; 15 min; 300 mm; 300 mm FAB automation operation productivity; 300 mm FAB transportation automation; 8 min; AMHS matrix; automated material handling system; just-in-time integrated system design; return of investment; Buffer storage; Costs; Dispatching; Investments; Manufacturing automation; Performance gain; Production facilities; Production systems; Productivity; Transportation;
fLanguage
English
Publisher
ieee
Conference_Titel
Semiconductor Manufacturing Technology Workshop Proceedings, 2004
Print_ISBN
0-7803-8469-5
Type
conf
DOI
10.1109/SMTW.2004.1393706
Filename
1393706
Link To Document