• DocumentCode
    2558633
  • Title

    Just-in-time AMHS delivery for 300 mm FAB

  • Author

    Chang, Jonathan ; Cheng, Yung

  • Author_Institution
    Inst. of Manuf. Eng., Nat. Cheng Kung Univ., Tainan, Taiwan
  • fYear
    2004
  • fDate
    9-10 Sept. 2004
  • Firstpage
    25
  • Lastpage
    28
  • Abstract
    When investing high cost to setup a 300 mm FAB transportation automation (3% of overall 300 mm FAB capital according to ITRS 2003), we always review the performance and KPl of this huge investment to make sure that the investment could gain sufficient ROI (return of investment) from 300 mm FAB automation operation productivity. When we are approaching ITRS´s AMHS matrix - average FAB wide transportation should be 8 minutes; maximum FAB wide FOUP transportation should be 15 minutes. We found that just-in-time integrated system design could easily gain more 300 mm full-automation productivity than expensive AMHS investment.
  • Keywords
    goods distribution; investment; just-in-time; materials handling; semiconductor device manufacture; semiconductor technology; 15 min; 300 mm; 300 mm FAB automation operation productivity; 300 mm FAB transportation automation; 8 min; AMHS matrix; automated material handling system; just-in-time integrated system design; return of investment; Buffer storage; Costs; Dispatching; Investments; Manufacturing automation; Performance gain; Production facilities; Production systems; Productivity; Transportation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Semiconductor Manufacturing Technology Workshop Proceedings, 2004
  • Print_ISBN
    0-7803-8469-5
  • Type

    conf

  • DOI
    10.1109/SMTW.2004.1393706
  • Filename
    1393706