• DocumentCode
    2592432
  • Title

    Developing a Model to Simulate Least Economic Cost Evaluation of Transmission Expansion Investment

  • Author

    Marais, R.H. ; Zivanovic, Rastko ; Estment, Roy

  • Author_Institution
    Eskom Transmission
  • fYear
    2006
  • fDate
    11-15 June 2006
  • Firstpage
    1
  • Lastpage
    8
  • Abstract
    Transmission planning can broadly be categorized into deterministic and probabilistic reliability planning. The probabilistic approach is often preferred as it aims to reduce transmission supply costs, by sharing risk between the customer and the utility. This is done by determining the least economic cost (LEC) between the customer interruption cost (CIC) and capital investment required to improve the network reliability. However performing a LEC evaluation requires substantially more variables than deterministic evaluation
  • Keywords
    investment; power transmission economics; power transmission planning; power transmission reliability; probability; CIC; LEC; capital investment; customer interruption cost; deterministic-probabilistic reliability planning; least economic cost; least economic cost evaluation; network reliability; transmission expansion investment; transmission planning; Africa; Costs; Investments; Libraries; Performance evaluation; Power generation economics; Power system modeling; Power system planning; Power system reliability; Power system simulation; Decision-making; EEAR; EENS; Power transmission economics; Power transmission planning;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Probabilistic Methods Applied to Power Systems, 2006. PMAPS 2006. International Conference on
  • Conference_Location
    Stockholm
  • Print_ISBN
    978-91-7178-585-5
  • Type

    conf

  • DOI
    10.1109/PMAPS.2006.360330
  • Filename
    4202342