DocumentCode
2594506
Title
On the use of loss penalty factors for generation scheduling
Author
Ramos, JosC Luis Martinez ; Exposito, A.G. ; Moron, F.J.C. ; Becerra, Sergio Nogales
Author_Institution
Dept. of Electr. Eng., Seville Univ., Spain
Volume
2
fYear
2003
fDate
13-17 July 2003
Abstract
In this paper, some practical issues regarding the computation of penalty factors and their application in generation scheduling are critically presented, along with some results corresponding to the Spanish transmission network and generating units. Firstly, modelling errors such as the use of an AC or DC network model and the localisation of the reference bus are discussed and quantified. Secondly, some practical considerations regarding the use of penalty factors in generation scheduling programs, such as the computation of the penalty factors exante or expost the commitment are presented.
Keywords
hydrothermal power systems; power generation planning; power generation scheduling; transmission networks; AC network model; DC network model; Spanish transmission network; generation planning; hydro-thermal scheduling; loss penalty factors; Arm; Computer networks; Costs; Optimal scheduling; Power generation; Power system economics; Power system planning; Processor scheduling; Propagation losses; Thermal factors;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2003, IEEE
Print_ISBN
0-7803-7989-6
Type
conf
DOI
10.1109/PES.2003.1270432
Filename
1270432
Link To Document