• DocumentCode
    2609211
  • Title

    Nonlinear programming solution for optimum PM schedule of auxiliary components

  • Author

    Al-Mishari, Salman T. ; Suliman, S.M.A.

  • Author_Institution
    Saudi Aramco, Dhahran
  • fYear
    2007
  • fDate
    2-4 Dec. 2007
  • Firstpage
    657
  • Lastpage
    662
  • Abstract
    Auxiliary components in some systems exist only to serve some other primary components. Preventive maintenance (PM) activities are, therefore, done to these auxiliary components for the sake of extending the life of the primary component. Frequent PM care to auxiliary components increase the cost of PM while infrequent PM leads to increasing downtime of the primary component and, subsequently, production losses. The search for the optimal level of PM care requires a nonlinear programming (NLP) solution that can, sometimes, be very complex. This paper suggests that a very useful pattern exists in the NLP model of this optimization problem which can significantly reduce the complexity of model formulation and the arrival to the NLP solution.
  • Keywords
    nonlinear programming; preventive maintenance; scheduling; auxiliary components; nonlinear programming solution; optimum PM schedule; preventive maintenance; Costs; Inspection; Machinery; Mechanical engineering; Petroleum; Preventive maintenance; Production facilities; Seals; Solenoids; Valves; Analytical Optimization; Nonlinear Programming; Preventive Maintenance;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management, 2007 IEEE International Conference on
  • Conference_Location
    Singapore
  • Print_ISBN
    978-1-4244-1529-8
  • Electronic_ISBN
    978-1-4244-1529-8
  • Type

    conf

  • DOI
    10.1109/IEEM.2007.4419272
  • Filename
    4419272