DocumentCode
2609211
Title
Nonlinear programming solution for optimum PM schedule of auxiliary components
Author
Al-Mishari, Salman T. ; Suliman, S.M.A.
Author_Institution
Saudi Aramco, Dhahran
fYear
2007
fDate
2-4 Dec. 2007
Firstpage
657
Lastpage
662
Abstract
Auxiliary components in some systems exist only to serve some other primary components. Preventive maintenance (PM) activities are, therefore, done to these auxiliary components for the sake of extending the life of the primary component. Frequent PM care to auxiliary components increase the cost of PM while infrequent PM leads to increasing downtime of the primary component and, subsequently, production losses. The search for the optimal level of PM care requires a nonlinear programming (NLP) solution that can, sometimes, be very complex. This paper suggests that a very useful pattern exists in the NLP model of this optimization problem which can significantly reduce the complexity of model formulation and the arrival to the NLP solution.
Keywords
nonlinear programming; preventive maintenance; scheduling; auxiliary components; nonlinear programming solution; optimum PM schedule; preventive maintenance; Costs; Inspection; Machinery; Mechanical engineering; Petroleum; Preventive maintenance; Production facilities; Seals; Solenoids; Valves; Analytical Optimization; Nonlinear Programming; Preventive Maintenance;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management, 2007 IEEE International Conference on
Conference_Location
Singapore
Print_ISBN
978-1-4244-1529-8
Electronic_ISBN
978-1-4244-1529-8
Type
conf
DOI
10.1109/IEEM.2007.4419272
Filename
4419272
Link To Document