• DocumentCode
    2610770
  • Title

    Applying critical chain in project scheduling and estimating buffer size based on fuzzy technique

  • Author

    Li, Kun ; Chen, Yun-xiang

  • Author_Institution
    Air Force Eng. Univ., Xi´´an
  • fYear
    2007
  • fDate
    2-4 Dec. 2007
  • Firstpage
    1068
  • Lastpage
    1072
  • Abstract
    Project scheduling has long been an area of intensive research. Aiming at the problems in the current Scheduling Management based on classical network scheduling techniques, this paper analyzes the principles of the theory of critical chain and the applications in project scheduling management, and discusses the principles of project buffer under the comparison of critical chain and classical network scheduling techniques. However, in the real world, project activities are subject to considerable uncertainty, which affects the performance of project scheduling management. A fuzzy method is researched to estimate the buffer size in critical chain scheduling to reduce the uncertainty degree. The test results indicate the evaluation based on fuzzy technique can improve the performance of project schedule. The future works are mentioned in the end.
  • Keywords
    fuzzy set theory; project management; scheduling; buffer size estimating; critical chain; critical chain scheduling; fuzzy technique; network scheduling techniques; project buffer; project scheduling; scheduling management; Constraint theory; Costs; Humans; Project management; Protection; Risk management; Stochastic processes; Testing; Uncertainty; Buffer; Critical chain; Fuzzy technique; Project scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management, 2007 IEEE International Conference on
  • Conference_Location
    Singapore
  • Print_ISBN
    978-1-4244-1529-8
  • Electronic_ISBN
    978-1-4244-1529-8
  • Type

    conf

  • DOI
    10.1109/IEEM.2007.4419356
  • Filename
    4419356