DocumentCode
2617773
Title
GenCos´ participation in the unbundled energy market
Author
Gutiérrez-Alcaraz, Guillermo ; Sheblé, Gerald B.
Author_Institution
Dept. of Electr. Eng. & Comput. Eng., Iowa State Univ., Ames, IA, USA
fYear
2004
fDate
10-13 Oct. 2004
Firstpage
966
Abstract
In this document we analyze market producers´ participation in the new unbundled energy market. The electricity market is in the process of unbundling the ancillary services. In a fully unbundled electricity market more extensive analysis needs to be performed given that market participation is not restricted to electricity production. Ancillary services were bundled within the integrated generation and transmission services in the vertical integrated industry. Instead of being bundled with generation and transmission, the individual services are now uniquely identified in the competitive markets. In this new market environment, the decision making process can be seen as an activity analysis problem. Market participants will need to determine the most probable and profitable future market actions based on the last known market data and market projection.
Keywords
decision making; power generation scheduling; power markets; transmission networks; activity analysis problem; ancillary service; competitive market; decision making process; electricity market; integrated generation-transmission service; market producer participation; unbundled energy market; Contracts; Costs; Decision making; Electricity supply industry; Environmental economics; Fuel economy; Performance analysis; Power generation economics; Production; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Systems Conference and Exposition, 2004. IEEE PES
Print_ISBN
0-7803-8718-X
Type
conf
DOI
10.1109/PSCE.2004.1397697
Filename
1397697
Link To Document