• DocumentCode
    2618715
  • Title

    Simulation-based planning for precast production with two critical resources

  • Author

    Zhai, Xiaofeng ; Tiong, Robert L.K. ; Bjornsson, Hans C. ; Chua, David K H

  • Author_Institution
    Nanyang Technol. Univ., Singapore
  • fYear
    2007
  • fDate
    9-12 Dec. 2007
  • Firstpage
    2104
  • Lastpage
    2111
  • Abstract
    Planning plays an important role in precast production management. In practice, however, this work is primarily carried out on a rule-of-thumb basis. A specialized planning model based on simulation technique and genetic algorithm (GA) is presented in this paper for precast production with two critical resources. A novel priority rule, the critical precast component (CP) rule, is established for mold considerations during simulation, and a bi-directional simulation is adopted to reduce excessive overtime and precast stock. On this basis, three simulation approaches are designed using different simulation heuristics and directions. To test the validity of the proposed model with different approaches, a planning experiment is carried out. By comparison, it is clear that the Simulation-GA based model using CP rule and bi-directional simulation can generate a satisfying resource plan and production schedule.
  • Keywords
    concrete; construction industry; digital simulation; genetic algorithms; production planning; critical precast component rule; genetic algorithm; precast production management; simulation-based production planning; Bidirectional control; Capacity planning; Concrete; Delay; Job shop scheduling; Manufacturing; Personal communication networks; Production planning; Technology planning; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference, 2007 Winter
  • Conference_Location
    Washington, DC
  • Print_ISBN
    978-1-4244-1306-5
  • Electronic_ISBN
    978-1-4244-1306-5
  • Type

    conf

  • DOI
    10.1109/WSC.2007.4419843
  • Filename
    4419843