Title
Simulation-based planning for precast production with two critical resources
Author
Zhai, Xiaofeng ; Tiong, Robert L.K. ; Bjornsson, Hans C. ; Chua, David K H
Author_Institution
Nanyang Technol. Univ., Singapore
fYear
2007
fDate
9-12 Dec. 2007
Firstpage
2104
Lastpage
2111
Abstract
Planning plays an important role in precast production management. In practice, however, this work is primarily carried out on a rule-of-thumb basis. A specialized planning model based on simulation technique and genetic algorithm (GA) is presented in this paper for precast production with two critical resources. A novel priority rule, the critical precast component (CP) rule, is established for mold considerations during simulation, and a bi-directional simulation is adopted to reduce excessive overtime and precast stock. On this basis, three simulation approaches are designed using different simulation heuristics and directions. To test the validity of the proposed model with different approaches, a planning experiment is carried out. By comparison, it is clear that the Simulation-GA based model using CP rule and bi-directional simulation can generate a satisfying resource plan and production schedule.
Keywords
concrete; construction industry; digital simulation; genetic algorithms; production planning; critical precast component rule; genetic algorithm; precast production management; simulation-based production planning; Bidirectional control; Capacity planning; Concrete; Delay; Job shop scheduling; Manufacturing; Personal communication networks; Production planning; Technology planning; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference, 2007 Winter
Conference_Location
Washington, DC
Print_ISBN
978-1-4244-1306-5
Electronic_ISBN
978-1-4244-1306-5
Type
conf
DOI
10.1109/WSC.2007.4419843
Filename
4419843
Link To Document