• DocumentCode
    2627323
  • Title

    Revenue based maintenance scheduling of a GENCO in restructured power systems

  • Author

    Tabari, Nima Mohammadi ; Pirmoradian, Mahdi ; Hassanpour, Seiiedeh Bahareh

  • Author_Institution
    Control Dept., Islamic Azad Univ., Tehran
  • fYear
    2008
  • fDate
    21-25 July 2008
  • Firstpage
    155
  • Lastpage
    158
  • Abstract
    In a restructured power system, the problem of maintenance scheduling is different from the traditional centralized power system. This paper is demonstrated how GENCOs (generating companies) in a competitive environment prepare the maintenance schedule of their facilities. Taking into account that in the new structure the main purposes of GENCOs are selling electricity as much as possible and making higher profit, the model is setting up. The model consists of an objective function and related constraints, e.g. maintenance window, generation capacity, load and network flow. We apply the branch-and-bound optimization methodology on a GENCO and finally make a discussion about the simulation results.
  • Keywords
    maintenance engineering; power generation economics; power system management; GENCO; centralized power system; generating companies; restructured power systems; revenue based maintenance scheduling; Cost function; Electricity supply industry deregulation; Energy consumption; Maintenance; Power generation; Power system control; Power system modeling; Power system reliability; Power systems; Power transmission lines;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computational Technologies in Electrical and Electronics Engineering, 2008. SIBIRCON 2008. IEEE Region 8 International Conference on
  • Conference_Location
    Novosibirsk
  • Print_ISBN
    978-1-4244-2133-6
  • Electronic_ISBN
    978-1-4244-2134-3
  • Type

    conf

  • DOI
    10.1109/SIBIRCON.2008.4602633
  • Filename
    4602633