  • Title

    Planned islanding for Brazilian system reliability

  • Author

    Londero, Rafael R. ; Affonso, Carolina M. ; Nunes, Marcus V A ; Freitas, Walmir

  • Author_Institution
    Fac. of Electr. Eng., Fed. Univ. of Para, Belem, Brazil
  • fYear
    2010
  • fDate
    19-22 April 2010
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    This paper presents an impact study case of a new operational strategy regarding planned islanding operation of distributed generation. Traditionally, interconnection standards avoid islanding operation of distributed generation due to the concerns of equipment failure and safety issues. However, allowing the islanded operation of distributed generation may enhance reliability to final consumers and decrease outage cost by providing an alternative power source when there is an interruption in the upstream network. This paper performs dynamic studies in a Brazilian system which operates in the islanded mode during fault to supply critical loads. The analysis presented in this paper includes the behavior of the islanded system under load following and load rejection, faults, the load-frequency control and varying short-circuit level. The results show that this operational strategy can potentially bring many benefits to the distributed generator owner and customers.
  • Keywords
    Control systems; Costs; Distributed control; Distributed power generation; Hydroelectric power generation; Power generation; Power system dynamics; Power system interconnection; Power system reliability; System testing; Distributed generation (DG); dynamic performance; impact study; planned islanding;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Transmission and Distribution Conference and Exposition, 2010 IEEE PES
  • Conference_Location
    New Orleans, LA, USA
  • Print_ISBN
    978-1-4244-6546-0
  • Type

    conf

  • DOI
    10.1109/TDC.2010.5484251
  • Filename
    5484251