DocumentCode
2641067
Title
Computer integrated control system of a new slab caster in the Mizushima Works
Author
Urakami, Masahiko ; Yamane, Akira
Author_Institution
Kawasaki Steel Corp., Mizushima, Kurashiki, Japan
fYear
1993
fDate
27-29 Sep 1993
Firstpage
265
Lastpage
274
Abstract
In 1993, No. 4 Continuous Caster (No. 4 CC) went on stream on Kawasaki Steel´s Mizushima Works. At No. 4 CC, an integrated EIC (Electrical, Instrumentation, Process Computer) control system was adopted. The background of the selection of the integrated EIC system, the general outline of the system, system performance after introduction, and the design features of the main operation room are described
Keywords
casting; computer integrated manufacturing; industrial control; steel industry; steel manufacture; Continuous Caster; EIC system; Kawasaki Steel; Mizushima Works; computer integrated control; design features; process computer control; slab caster; system performance; Centralized control; Data engineering; Distributed control; Instruments; Knowledge engineering; Metals industry; Programmable control; Slabs; Solids; Steel;
fLanguage
English
Publisher
ieee
Conference_Titel
Emerging Technologies and Factory Automation, 1993. Design and Operations of Intelligent Factories. Workshop Proceedings., IEEE 2nd International Workshop on
Conference_Location
Palm Cove-Cairns, Qld.
Print_ISBN
0-7803-0985-5
Type
conf
DOI
10.1109/ETFA.1993.396400
Filename
396400
Link To Document