• DocumentCode
    2643964
  • Title

    An implementation plan for integrated control and asset management of petroleum production facilities

  • Author

    Sayda, Atalla F. ; Taylor, James H.

  • Author_Institution
    Department of Electrical & Computer Engineering, University of New Brunswick, PO Box 4400, Fredericton, CANADA E3B 5A3
  • fYear
    2006
  • fDate
    4-6 Oct. 2006
  • Firstpage
    1212
  • Lastpage
    1219
  • Abstract
    This paper addresses innovative issues of asset management for the petroleum industry, which is very crucial for profitable oil and gas facilities operations and maintenance. A research project was initiated to study the feasibility of an intelligent asset management system. Having proposed a conceptual model for such a system in previous work [1], [2], we describe its behavior in terms of data and control flow, and pave the way for an implementation and rapid prototyping plan for such system. Furthermore we discuss the required off-the-shelf development tools. A simplified system prototype is introduced as a colored petri net model, which will be used to analyze the prototype logical structure and dynamic performance. We finally discuss the project progress status and future work.
  • Keywords
    Artificial intelligence; Asset management; Automatic control; Centralized control; Competitive intelligence; Intelligent systems; Petroleum; Power system modeling; Production facilities; Prototypes;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer Aided Control System Design, 2006 IEEE International Conference on Control Applications, 2006 IEEE International Symposium on Intelligent Control, 2006 IEEE
  • Conference_Location
    Munich, Germany
  • Print_ISBN
    0-7803-9797-5
  • Electronic_ISBN
    0-7803-9797-5
  • Type

    conf

  • DOI
    10.1109/CACSD-CCA-ISIC.2006.4776815
  • Filename
    4776815