• DocumentCode
    2658987
  • Title

    LNLS vacuum system commissioning

  • Author

    Ferreira, M.J. ; Ferraz, R.O. ; Minuzzi, F.A. ; Silva, M.B.

  • Author_Institution
    Lab. Nacional de Luz Sincrotron, Campinas, Brazil
  • Volume
    3
  • fYear
    1997
  • fDate
    12-16 May 1997
  • Firstpage
    3628
  • Abstract
    The Brazilian National Synchrotron Light Laboratory, LNLS, operates a synchrotron light source consisting of a 1.37 GeV electron storage ring and a 120 MeV injector. A summary of the commissioning and operation performance of the vacuum system for the linear accelerator (LINAC), transport line, RF system and storage ring is presented. The performance of the subsystems is described including the photon induced desorptions (PID) and the effects on the beam lifetime
  • Keywords
    accelerator RF systems; electron accelerators; linear accelerators; storage rings; vacuum apparatus; 1.37 GeV; 120 MeV; Brazilian National Synchrotron Light Laboratory; LNLS vacuum system commissioning; RF system; beam lifetime; electron storage ring; linear accelerator; photon induced desorptions; storage ring; synchrotron light source; transport line; Acceleration; Ceramics; Copper; Linear accelerators; Linear particle accelerator; Radio frequency; Storage rings; Synchrotrons; Vacuum systems; Ventilation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1997. Proceedings of the 1997
  • Conference_Location
    Vancouver, BC
  • Print_ISBN
    0-7803-4376-X
  • Type

    conf

  • DOI
    10.1109/PAC.1997.753296
  • Filename
    753296