• DocumentCode
    2658993
  • Title

    Developing new power system supervision and control equipment (PS-SVC) for power receiving facilities

  • Author

    Murakami, Toshiaki ; Naitou, Hiroshi ; Tawara, Takeru

  • Author_Institution
    NTT Facilities, Inc., Tokyo, Japan
  • fYear
    2009
  • fDate
    18-22 Oct. 2009
  • Firstpage
    1
  • Lastpage
    7
  • Abstract
    We have developed highly reliable and economical supervision and control equipment, PS-SVC, for the power receiving facilities used in telecommunication. We summarized the conditions required for the equipment and planned an approach to the technical problems. In addition, we introduce PS-SVC technical methodology which achieved higher reliability and lower cost than PLC while suppressing increases in cost for the general-purpose (PLC) in particular by using a modular structure and duplicating functional units on a single board. We compared PS-SVC with PLC and evaluated them quantitatively from the viewpoints of reliability and economy. This system is very useful equipment for communication carriers which introduce large numbers of supervision and control equipment.
  • Keywords
    power system control; power system reliability; power receiving facilities; power system control equipment; power system supervision equipment; telecommunication; Control equipment; Power system control; Power systems;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Telecommunications Energy Conference, 2009. INTELEC 2009. 31st International
  • Conference_Location
    Incheon
  • Print_ISBN
    978-1-4244-2490-0
  • Electronic_ISBN
    978-1-4244-2491-7
  • Type

    conf

  • DOI
    10.1109/INTLEC.2009.5351887
  • Filename
    5351887