• DocumentCode
    2660958
  • Title

    Progress report on the construction of the Northeast Proton Therapy Center (NPTC) equipment

  • Author

    Jongen, Y. ; Abs, M. ; Amelia, J.-C. ; Beeckman, W. ; Kleeven, W. ; Ladeuze, M. ; Lannoye, G. ; Laycock, S. ; Leyman, D. ; Poreye, V. ; Prieels, D. ; Vandeplassche, D. ; Zaremba, S. ; Heiberger, M. ; Hubbard, E. ; Hurn, T. ; Nissley, L. ; Silke, C. ; Tabo

  • Author_Institution
    Ion Beam Applications, Louvain-la-Neuve, Belgium
  • Volume
    3
  • fYear
    1997
  • fDate
    12-16 May 1997
  • Firstpage
    3816
  • Abstract
    The IBA proton therapy system selected by the Massachusetts General Hospital (MGH) to equip its new NPTC is presently under construction and test. This paper presents a progress report on the equipment construction. The cyclotron, as well as the rest of the equipment, are being progressively installed in the NPTC building. The acceptance tests of the whole system are foreseen for the end of 1997
  • Keywords
    cyclotrons; proton accelerators; radiation therapy; IBA proton therapy system; Massachusetts General Hospital; NPTC; Northeast Proton Therapy Center; acceptance tests; cyclotron; equipment construction; Control systems; Cyclotrons; Degradation; Ion beam applications; Medical treatment; Protons; Safety; Structural beams; Switching systems; System testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1997. Proceedings of the 1997
  • Conference_Location
    Vancouver, BC
  • Print_ISBN
    0-7803-4376-X
  • Type

    conf

  • DOI
    10.1109/PAC.1997.753425
  • Filename
    753425