• DocumentCode
    2670927
  • Title

    Research on ROI of BT project based on Singel-factor APT model

  • Author

    Gao, Hua ; Wang, Li-juan

  • Author_Institution
    Manage. Sch., Tianjin Univ. of Technol., Tianjin, China
  • fYear
    2010
  • fDate
    17-19 Sept. 2010
  • Firstpage
    841
  • Lastpage
    843
  • Abstract
    ROI of BT projects is involved in the benefit distribution and risk allocation between BT project initiator (local government or local governmental branch) and BT project investor and constractor (the private sector), and is related to the success or failure of BT projects. Up to now, the government departments have not promulgated laws or regulations about how to make sure ROI of BT project. So how to make sure ROI of BT project becomes the problem in the negotiation of BT project. Starting from international practice, the thesis sets down ROI of BT project in reference on Singel-factor APT model.
  • Keywords
    investment; project management; set theory; BT project constractor; BT project initiator; BT project investor; benefit distribution; build-transfer; risk allocation; singel factor APT model; thesis sets; Biological system modeling; Contracts; Force; Investments; Probability; Sensitivity; Shape; BT(Build-Transfer) mode; ROI(Return of investment); Singel-factor APT model Introduction;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information and Financial Engineering (ICIFE), 2010 2nd IEEE International Conference on
  • Conference_Location
    Chongqing
  • Print_ISBN
    978-1-4244-6927-7
  • Type

    conf

  • DOI
    10.1109/ICIFE.2010.5609486
  • Filename
    5609486