DocumentCode
2670927
Title
Research on ROI of BT project based on Singel-factor APT model
Author
Gao, Hua ; Wang, Li-juan
Author_Institution
Manage. Sch., Tianjin Univ. of Technol., Tianjin, China
fYear
2010
fDate
17-19 Sept. 2010
Firstpage
841
Lastpage
843
Abstract
ROI of BT projects is involved in the benefit distribution and risk allocation between BT project initiator (local government or local governmental branch) and BT project investor and constractor (the private sector), and is related to the success or failure of BT projects. Up to now, the government departments have not promulgated laws or regulations about how to make sure ROI of BT project. So how to make sure ROI of BT project becomes the problem in the negotiation of BT project. Starting from international practice, the thesis sets down ROI of BT project in reference on Singel-factor APT model.
Keywords
investment; project management; set theory; BT project constractor; BT project initiator; BT project investor; benefit distribution; build-transfer; risk allocation; singel factor APT model; thesis sets; Biological system modeling; Contracts; Force; Investments; Probability; Sensitivity; Shape; BT(Build-Transfer) mode; ROI(Return of investment); Singel-factor APT model Introduction;
fLanguage
English
Publisher
ieee
Conference_Titel
Information and Financial Engineering (ICIFE), 2010 2nd IEEE International Conference on
Conference_Location
Chongqing
Print_ISBN
978-1-4244-6927-7
Type
conf
DOI
10.1109/ICIFE.2010.5609486
Filename
5609486
Link To Document