DocumentCode
2672815
Title
Optimal Generator Start-Up Strategy for Power System Restoration
Author
Sun, Wei ; Chen-Ching Liu ; Chu, Ron F.
Author_Institution
Dept. of Electr. & Comput. Eng., Iowa State Univ., Ames, IA, USA
fYear
2009
fDate
8-12 Nov. 2009
Firstpage
1
Lastpage
7
Abstract
In an earlier EPRI project, the authors employed a knowledge-based system (KBS) to develop a tool to guide system operators to restart generators after a blackout. In this paper, the authors convert the KBS formulation into a Mixed Integer Quadratically Constrained Program (MIQCP) problem. Taking advantage of the quasiconcave property of the generation ramping curves, an algorithm to solve the generator start-up sequence problem is proposed. The solution method breaks the restoration horizon into intervals and develops the restoration plan by finding the status of each generator at each time interval. Optimality is achieved at each step. The algorithm was tested using the PECO data from the EPRI project.
Keywords
deductive databases; genetic algorithms; power system restoration; knowledge-based system; mixed integer quadratically constrained program; optimal generator start-up strategy; power system restoration; Constraint optimization; Dynamic programming; Hydraulic turbines; Knowledge based systems; Mathematical programming; NIST; Power generation; Power system restoration; Sun; Time factors;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent System Applications to Power Systems, 2009. ISAP '09. 15th International Conference on
Conference_Location
Curitiba
Print_ISBN
978-1-4244-5097-8
Electronic_ISBN
978-1-4244-5098-5
Type
conf
DOI
10.1109/ISAP.2009.5352958
Filename
5352958
Link To Document