• DocumentCode
    2692022
  • Title

    Decomposition of a fixed-profile load scheduling method for large-scale irrigation channels

  • Author

    Li, Yuping ; Alende, Julien ; Cantoni, Michael ; De Schutter, Bart

  • Author_Institution
    Delft Center for Syst. & Control, Delft Univ. of Technol., Delft, Netherlands
  • fYear
    2010
  • fDate
    8-10 Sept. 2010
  • Firstpage
    2166
  • Lastpage
    2171
  • Abstract
    The problem of fixed-profile load scheduling is considered for large-scale irrigation channels. Based on the analysis of the special structure of a channel under decentralised control, a predictive model is built on a pool-by-pool basis and a decomposition strategy of the scheduling problem is provided. The decomposition avoids excessive memory requirements in building the predictive model of the controlled plant and solving the formulated optimisation problem.
  • Keywords
    channel flow; decentralised control; flow control; irrigation; optimisation; predictive control; scheduling; channel structure; decentralised control; decomposition strategy; fixed-profile load scheduling method; large-scale irrigation channels; memory requirement; optimisation problem; predictive model; Delay; Irrigation; Optimization; Predictive models; Schedules; Scheduling; Transient analysis; Fixed-profile load scheduling; constrained optimisation; hierarchical control; large-scale systems; predictive model; {0, 1} linear programming;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control Applications (CCA), 2010 IEEE International Conference on
  • Conference_Location
    Yokohama
  • Print_ISBN
    978-1-4244-5362-7
  • Electronic_ISBN
    978-1-4244-5363-4
  • Type

    conf

  • DOI
    10.1109/CCA.2010.5611071
  • Filename
    5611071