DocumentCode
2692136
Title
The Large-Scale Nuclear Power Plant Achieve for Research Equipment for Production and Material Platform
Author
Li, Hui ; Zhu, Xudong ; Tang, Hao ; Xie, Zeng ; Xin, Yu
Author_Institution
Inf. Technol. Center, China Guangdong Nucl. Power Corp., Shenzhen, China
fYear
2012
fDate
7-9 July 2012
Firstpage
360
Lastpage
363
Abstract
As the go as the vigorous development of Chinese nuclear power industry, nuclear power technology is increasingly mature. During Nuclear power plant construction preparation period, a large number of production materials need to be standardized and need professional management, which are still needing to be solved. This paper uses ECP system (take equipment management as the center of production materials platform, the taking Equipment management as the Center of production and goods Platform) to introduce a new management and utilization modes of modern production materials.
Keywords
nuclear power stations; power engineering computing; power generation planning; production materials; Chinese nuclear power industry; ECP system; large-scale nuclear power plant; nuclear power plant construction preparation period; production material platform; professional management; research equipment; Business; Databases; Maintenance engineering; Materials; Power generation; Production; Training; material management; modern management technology; nuclear power construction;
fLanguage
English
Publisher
ieee
Conference_Titel
Computing, Measurement, Control and Sensor Network (CMCSN), 2012 International Conference on
Conference_Location
Taiyuan
Print_ISBN
978-1-4673-2033-7
Type
conf
DOI
10.1109/CMCSN.2012.88
Filename
6245887
Link To Document