• DocumentCode
    2706658
  • Title

    Multiple crane scheduling in batch annealing process with no-delay constraints for machine unloading

  • Author

    Xie, Xie ; Li, Yanping ; Zheng, Yongyue

  • Author_Institution
    Key Lab. of Manuf. Ind. & Integrated Autom., Shenyang Univ., Shenyang, China
  • fYear
    2012
  • fDate
    6-8 June 2012
  • Firstpage
    597
  • Lastpage
    601
  • Abstract
    This paper investigates the problem of multi-crane scheduling in batch annealing process in steel enterprises so that the completion time of the last annealed coil (makespan) is minimized. In the annealing process, each coil consists of two-stage processing: heating and cooling. To start heating (cooling) stage, a special machine named furnace (cooler) must be loaded on. Once the heating (cooling) is completed, the furnace (cooler) must be unloaded immediately without any delay by crane (machine unloading no-delay constraints). The aim of our studied problem is to schedule limited machines (furnaces and coolers) operated by multiple crane to process jobs with avoiding collisions between two adjacent cranes and guaranteeing machine unloading no-delay constraints. For this demonstrated strongly NP-hard problem, we present a heuristic algorithm combined earliest job requirement and closest crane first with running time in connection with the number of cranes, jobs and machines. Then we propose some properties for deriving a lower bound to verify the performance of the proposed heuristics. Through the theoretically analysis, we show the worst case bound of our heuristic algorithm.
  • Keywords
    annealing; batch processing (industrial); cold rolling; computational complexity; cooling; cranes; furnaces; job shop scheduling; minimisation; steel industry; steel manufacture; unloading; adjacent cranes; batch annealing process; closest crane first; cold rolling; collision avoidance; completion time; cooling process; earliest job requirement; furnace; heating process; heuristic algorithm; job processing; last annealed coil; machine unloading; makespan minimization; multiple crane scheduling; no-delay constraint; steel enterprise; strongly NP-hard problem; two-stage processing; Annealing; Conferences; Cranes; Furnaces; Integrated circuits; Job shop scheduling; Batch annealing process; Crane scheduling; Heuristic algorithm; Strongly NP-hard; Worst case analysis;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information and Automation (ICIA), 2012 International Conference on
  • Conference_Location
    Shenyang
  • Print_ISBN
    978-1-4673-2238-6
  • Electronic_ISBN
    978-1-4673-2236-2
  • Type

    conf

  • DOI
    10.1109/ICInfA.2012.6246883
  • Filename
    6246883