• DocumentCode
    2717161
  • Title

    Delayed current zeros close to generator terminals

  • Author

    Fenske, S.

  • Author_Institution
    Dept. of Power Distrib. & High-Voltage Technol., Brandenburg Tech. Univ., Cottbus, Germany
  • fYear
    2010
  • fDate
    16-19 May 2010
  • Firstpage
    160
  • Lastpage
    161
  • Abstract
    The paper shows the switching behaviour of a grid circuit breaker in case of short circuits close to generator terminals. For the simulation a new three-phase circuit breaker model has been developed in the network calculation program Power-Factory. PowerFactory is an appropriate software to simulate the switching behaviour of a circuit breaker.
  • Keywords
    Circuit breakers; Circuit simulation; DSL; Delay; Page description languages; Power generation; Power system dynamics; Power system modeling; Power system simulation; Switching circuits; Circuit breaker; PowerFactory; power plant; pre-strikes; short circuit; simulation model;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Environment and Electrical Engineering (EEEIC), 2010 9th International Conference on
  • Conference_Location
    Prague, Czech Republic
  • Print_ISBN
    978-1-4244-5370-2
  • Electronic_ISBN
    978-1-4244-5371-9
  • Type

    conf

  • DOI
    10.1109/EEEIC.2010.5489961
  • Filename
    5489961