• DocumentCode
    2743600
  • Title

    PTB - UNIIM bilateral comparison on current transformer measurement systems at currents up to 60 000A

  • Author

    Mohns, E. ; Sychev, Y. ; Roeissle, G.

  • Author_Institution
    Phys.-Tech. Bundesanstalt (PTB), Braunschweig, Germany
  • fYear
    2012
  • fDate
    1-6 July 2012
  • Firstpage
    18
  • Lastpage
    19
  • Abstract
    This paper presents the results of a bilateral comparison of current transformer measurement systems at 50 Hz between PTB (pilot laboratory) and UNIIM. The comparison is registered at COOMET with the identifier 513/DE-a/10. The comparison of the systems using two two-stage current transformers from UNIIM and the data processing have been finished. The results agree within 6 μA / A for the current ratio errors and 8 μrad for the phase displacements at all current ratios from 1 A / 1 A to 50 kA / 5 A and at all test points from 1 % to 120 %. The associated EN factors are below 0.6.
  • Keywords
    current transformers; instrument transformers; measurement systems; phase measurement; COOMET; PTB; UNIIM; current ratio error; current transformer; data processing; frequency 50 Hz; measurement system; phase displacement; Current measurement; Current transformers; Frequency measurement; Measurement uncertainty; Standards; Uncertainty; Windings; current transformers (CT); instrument transformers; phase displacement; ratio error;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Precision Electromagnetic Measurements (CPEM), 2012 Conference on
  • Conference_Location
    Washington, DC
  • ISSN
    0589-1485
  • Print_ISBN
    978-1-4673-0439-9
  • Type

    conf

  • DOI
    10.1109/CPEM.2012.6250637
  • Filename
    6250637