• DocumentCode
    2748534
  • Title

    Guidelines for data-parallel cycle-stealing in networks of workstations. II. On maximizing guaranteed output

  • Author

    Rosenberg, Arnold L.

  • Author_Institution
    Dept. of Comput. & Inf. Sci., Massachusetts Univ., Amherst, MA, USA
  • fYear
    1999
  • fDate
    12-16 Apr 1999
  • Firstpage
    520
  • Lastpage
    524
  • Abstract
    For pt. I see 12th IEEE Intl. Parallel Proc. Symp., p. 519-23 (1998). We derive efficient guidelines for scheduling data-parallel computations within a draconian mode of cycle-stealing in networks of workstations wherein an interruption by the owner of the “borrowed” workstation kills all jobs currently in progress. We derive both adaptive and non-adaptive scheduling guidelines that maximize, up to low-order additive terms, the amount of work that one is guaranteed to accomplish during a cycle-stealing opportunity, no matter when the opportunity is interrupted-up to a prespecified number of times
  • Keywords
    parallel algorithms; processor scheduling; workstation clusters; data-parallel computations; data-parallel cycle-stealing; networks of workstations; Computer networks; Concurrent computing; Contracts; Guidelines; Intelligent networks; Optimal scheduling; Processor scheduling; Production; Roads; Workstations;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Parallel Processing, 1999. 13th International and 10th Symposium on Parallel and Distributed Processing, 1999. 1999 IPPS/SPDP. Proceedings
  • Conference_Location
    San Juan
  • Print_ISBN
    0-7695-0143-5
  • Type

    conf

  • DOI
    10.1109/IPPS.1999.760526
  • Filename
    760526