DocumentCode
2760401
Title
Charging Plan Model and Scheduling Algorithms for Walking Beam Furnaces
Author
Zhao, Jun ; Wang, Wei
Author_Institution
Res. Center of Inf. & Control, Dalian Univ. of Technol.
Volume
2
fYear
0
fDate
0-0 0
Firstpage
7415
Lastpage
7418
Abstract
Logistic procedure of walking beam furnace in steel production is analyzed and earliness/tardiness scheduling problem with multiple resources and identical parallel machines is modeled according to the closed relationship between furnaces and mill. A hybrid algorithm combined evolutionary computing with heuristic approach is proposed for solving this model. A simulation result with real production data shows that the hybrid algorithm is better than human-machine or heuristic approach
Keywords
beams (structures); evolutionary computation; furnaces; heuristic programming; logistics; production control; steel industry; charging plan model; earliness/tardiness scheduling; evolutionary computing; heuristic approach; identical parallel machines; production planning; scheduling algorithms; steel production; walking beam furnaces; Furnaces; Legged locomotion; Logistics; Milling machines; Parallel machines; Processor scheduling; Production; Scheduling algorithm; Steel; Structural beams; evolutionary algorithm; heuristic approach; production planning; walking beam furnace;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent Control and Automation, 2006. WCICA 2006. The Sixth World Congress on
Conference_Location
Dalian
Print_ISBN
1-4244-0332-4
Type
conf
DOI
10.1109/WCICA.2006.1714527
Filename
1714527
Link To Document