• DocumentCode
    2760401
  • Title

    Charging Plan Model and Scheduling Algorithms for Walking Beam Furnaces

  • Author

    Zhao, Jun ; Wang, Wei

  • Author_Institution
    Res. Center of Inf. & Control, Dalian Univ. of Technol.
  • Volume
    2
  • fYear
    0
  • fDate
    0-0 0
  • Firstpage
    7415
  • Lastpage
    7418
  • Abstract
    Logistic procedure of walking beam furnace in steel production is analyzed and earliness/tardiness scheduling problem with multiple resources and identical parallel machines is modeled according to the closed relationship between furnaces and mill. A hybrid algorithm combined evolutionary computing with heuristic approach is proposed for solving this model. A simulation result with real production data shows that the hybrid algorithm is better than human-machine or heuristic approach
  • Keywords
    beams (structures); evolutionary computation; furnaces; heuristic programming; logistics; production control; steel industry; charging plan model; earliness/tardiness scheduling; evolutionary computing; heuristic approach; identical parallel machines; production planning; scheduling algorithms; steel production; walking beam furnaces; Furnaces; Legged locomotion; Logistics; Milling machines; Parallel machines; Processor scheduling; Production; Scheduling algorithm; Steel; Structural beams; evolutionary algorithm; heuristic approach; production planning; walking beam furnace;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Control and Automation, 2006. WCICA 2006. The Sixth World Congress on
  • Conference_Location
    Dalian
  • Print_ISBN
    1-4244-0332-4
  • Type

    conf

  • DOI
    10.1109/WCICA.2006.1714527
  • Filename
    1714527