DocumentCode
2809059
Title
Application of ground penetrating radar to inspect the metro tunnel
Author
Yu Hai-zhong ; Ouyang Yu-feng ; Chen Hong
Author_Institution
Shenzhen Metro Group Co., Ltd., Shenzhen Municipal Design & Res. Inst. Co., Ltd., Shenzhen, China
fYear
2012
fDate
4-8 June 2012
Firstpage
759
Lastpage
763
Abstract
The main constructing methods of metro tunnel include shield tunneling method (TBM) and mining method. The quality of the tunnel constructed by mining method is less stable than by TBM. Various faults may occur during the construction. The tunnel should be inspected by reliable inspecting methods. The inspecting practices in Shenzhen metro indicate that ground penetrating radar (GPR) can be used to exactly inspect the thickness of the second lining, the rebar distribution within the second lining, the dense of the second lining concrete, the cave distribution behind the second lining and so on.
Keywords
ground penetrating radar; inspection; rebar; tunnels; Shenzhen metro; cave distribution; construction method; ground penetrating radar; metro tunnel inspection; mining method; rebar distribution; second lining concrete; shield tunneling method; Antenna measurements; Ground penetrating radar; Radar antennas; Receiving antennas; Reflection; Rocks; Tunneling; Cave; Concrete; Ground penetrating radar(GPR); Rebar; Second lining; Tunnel inspecting;
fLanguage
English
Publisher
ieee
Conference_Titel
Ground Penetrating Radar (GPR), 2012 14th International Conference on
Conference_Location
Shanghai
Print_ISBN
978-1-4673-2662-9
Type
conf
DOI
10.1109/ICGPR.2012.6254963
Filename
6254963
Link To Document