DocumentCode
2842094
Title
A note on two-agent single-machine scheduling problem with deteriorating jobs
Author
Liu, Peng ; Feng, Daguang ; Zhou, Xiaoye ; Tang, Qi
Author_Institution
Sch. of Manage., Shenyang Univ. of Technol., Shenyang, China
fYear
2010
fDate
26-28 May 2010
Firstpage
3832
Lastpage
3835
Abstract
This paper considers the two-agent scheduling problems with decreasing linear deterioration on a single machine. Two agents compete to perform their respective jobs on a common single machine, and each agent has his own criterion to optimize. The processing times of jobs are defined as a decreasing linear function of their starting times. The goal is to minimize the maximum cost of the first agent with the restriction that the makespan of the second agent cannot exceed a given upper bound. We propose the optimal properties and present the optimal polynomial time algorithm to solve the scheduling problem.
Keywords
minimisation; multi-agent systems; production engineering computing; single machine scheduling; deteriorating jobs; linear deterioration; optimal polynomial time algorithm; two-agent single-machine scheduling problem; Computational complexity; Cost function; Encoding; Heuristic algorithms; Polynomials; Processor scheduling; Scheduling algorithm; Single machine scheduling; Technology management; Upper bound; Deteriorating jobs; Scheduling; Single machine; Two-agent;
fLanguage
English
Publisher
ieee
Conference_Titel
Control and Decision Conference (CCDC), 2010 Chinese
Conference_Location
Xuzhou
Print_ISBN
978-1-4244-5181-4
Electronic_ISBN
978-1-4244-5182-1
Type
conf
DOI
10.1109/CCDC.2010.5498488
Filename
5498488
Link To Document